18529092692

Home >> News
News
Insufficient space in the U2000 Network Element Manager database prevents creation of SDH paths
| 2025-11-21|Back

Description of the problem

On a certain day, an OSN 3500 network element is hung under a network element in the current network, and after creating the network element and the logical connection fiber on the network management, the creation of the VC4 service layer path with the upstream station before fails, and it prompts that the resource cannot be found.

Alarm Message

Processing

1. Check the network management on the logical fiber creation is normal, to rule out the problem of no logical fiber.

2. As the equipment is newly opened, the situation of insufficient VC4 resources is ruled out.

3. Check the topology map of the network management, there is no MS path under this fiber, and a MS path will be automatically generated after the normal creation of a logical fiber, as shown in the following figure:

So the inability to create a VC4 service layer path is due to the absence of an MS path.

4. After deleting the logical fiber, upload the OSN 3500 network element and the upstream station network element, and then create the logical fiber, and found that the failure is still no MS path generation.

5. Pre-configure two network elements on the network management, and then create a logical fiber, and found that there is still no MS path generation, which proves that the MS path can not be generated because of the network management reasons, not due to the data anomaly of a network element.

6. Check the U2000 network management system monitoring, U2000 processes are normal, there is no abnormal unstarted process, the SDH end-to-end process to stop/start once, into the U2000 client found that the failure is still the same, still can not generate the MS path.

7. Check the U2000 network management system monitoring, found that the database monitoring nemgr_transDB_1 item occupies 99%, showing abnormalities, as shown in the following figure:

8. In accordance with the U2000 product documentation, "database self-growth failure" problem handling methods for manual expansion of the database, and then create a fiber-optic cable, can generate MS paths to create the VC4 service layer path is normal.

Root Cause

Insufficient space in the Network Element Manager database prevents the creation of MS paths, thus affecting the SDH path function.

Solution

The problem is solved after using manual database space expansion.


The technical information related to this chapter and the SDH equipment troubleshooting process are provided by Shenzhen Optical Transmission Network Technology Co.( www.opticaltrans.com), please retain! Huawei SDH Optical Transmission Equipment,SDH Transmission Equipment Sales


Optix OSN3500_Product Quotation_Sales Manufacturer_Product Characteristics_Product Description_Huawei SDH transmission equipment sales
Supply Optix OSN3500_Troubleshooting_Installation and testing_Technical specifications_Technical parameters_Huawei SDH transmission equipment sales

Contact Us
Name:Mr Zhang
Phone:18529092692
Tel:18529092692
Email:info@opticaltrans.com
Address:Cuiguang 1st Distriuct Buiding 8th, Shenzhen, Guangdong Province
Contact
18529092692
Phone:18529092692
Email:info@opticaltrans.com
Address:Cuiguang 1st Distriuct Buiding 8th, Shenzhen, Guangdong Province
Follow Us
Otrans Technology is a high-tech enterprise deeply engaged in optical transmission and network communication equipment, specializing in...
Copyright © 2025 Otrans all right reserve XML 网站模板