Problem Description
A carrier OSN3500 (host version 5.21.13.47) equipment main control board failure needs to be replaced. When replacing the main control board, it was found that the service of the whole network was interrupted after the new main control board was plugged in and the power was turned on. After downloading the configuration data to the network elements, the service returns to normal.
None
Redownload the configuration data.
Since all the services on the device are interrupted, first of all, it is suspected that verify was automatically sent from the host side after the main control board was started, which led to the service interruption caused by sending the empty data from the new main control board to the single board. However, when analyzing the black box at the time of the failure, no verify was found, and the network element reported the ne_install alarm after the new main control board started working. This means that no verify was issued on the network element side.
When the black box of the network element was analyzed, it was found that there were many records of requests for startup on both the master and backup crossover boards. When the new master board was started, the master and backup cross boards received separate responses for startup.
The only possibility through the black box analysis is that the main and backup cross boards had been reset before the replacement of the main control board, but after the reset, when applying for startup to the main control board, the main control board failed to get the confirmation from the host computer, and thus applied for startup without any limitation. After the new main control board started, the cross application switch was responded to, and the new main control board was in a safe state, so the automatic addition of the cross board rosette board was issued, resulting in business interruption.
When the black box of the network element was analyzed, it was found that there were many records of requests for startup on both the master and backup crossover boards. When the new master board was started, the master and backup cross boards received separate responses for startup.
The only possibility through the black box analysis is that the main and backup cross boards had been reset before the replacement of the main control board, but after the reset, when applying for startup to the main control board, the main control board failed to get the confirmation from the host computer, and thus applied for startup without any limitation. After the new main control board started, the cross application switch was responded to, and the new main control board was in a safe state, so the automatic addition of the cross board rosette board was issued, resulting in business interruption.
In replacing the master control board you need to query the status of the cross board, use the command cfg-get-workstat: bid to determine that the status of both the master and the backup cross board is working. if the master and the backup cross board status bit is not work (in this state business operations will not be interrupted), then the replacement of the master control board is bound to lead to business interruption.
END
Selling the OSN3500 SSN1SXCSA _Product Quotation_Sales Manufacturer_Product Characteristics_Product Description_Huawei SDH Transmission Equipment Sales
Supply OSN3500 SSN1SXCSA_Troubleshooting_Installation and Tuning_Technical Indicators_Technical Parameters_Huawei SDH Transmission Equipment Sales


Chinese
English





